ARCHIVE


Article from issue 8/1999 »Bridge Construction«

Pedestrian Bridge in the Inner Harbour of Duisburg

documentation    p. 1455 - 1458
Architect Schlaich, Bergermann + Partner | Structural Engineer Schlaich, Bergermann + Partner |

Drafts
Elevational detail 1:20
Part elevation 1:50
Sectional details 1:20
Site plan 1:7500
View from above, Elevation 1:1000

Designed as a suspension bridge with end stays, the structure is 3.5 m wide and spans a distance of roughly 73 m. In order not impede shipping, the deck can be raised to a clearance height of 10.6 m above the highest water level. The masts pivot outwards by means of hydraulic cylinders in the staying cables, and the deck, consisting of hinged precast concrete elements, is drawn upwards into an arched form. During this process, which lasts roughly 5 minutes, the walkway is increased in length by additional elements drawn out from the ends. The bridge can be fixed in three positions. The middle position is adequate for the passage of nearly all ships. Pedestrians are allowed to use the bridge only in its unraised state, however.


Related Articles to this Region

about the country of Germany
   Duisburg





DETAIL 8/1999

Bridge Construction

€ 11.00

>> order
Advertisment

Language

Deutsch English Italiano Espanol Français

User Login

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 09.02.2012