ARCHIVE


Article from issue 1+2/2003 »Steel Construction«

Balcony Renewal in Munich

documentation    p. 46 - 48
Architect Hild und K Architekten | Specialist Planner Bayer, Dirk | Structural Engineer Brengelmann, Timotheus |

Drafts
Sections Balcony 1:20

Over the years, the wrought-iron courtyard balconies of this late 19th-century block of flats had become so seriously dilapidated that a restoration of the existing construction was out of the question. The balconies had to be renewed, yet at the same time the character of the former structure was to be retained. Each of the new prefabricated balcony elements is suspended from the facade at only two points: via two-metre-long threaded anchor rods concreted into the external wall at the top of the balustrade.
The balcony units consist of steel Å-beams and a floor plate, with a welded balustrade and sheet-steel flower boxes around the three open sides. All these components form an integral part of the overall structural system. This economical means of construction, with minimal fixings to the existing building, meant that no additional thermal insulation or
changes to the facade were necessary. The plain sheet-steel construction was relieved by floral decoration based on that of similar historical balconies. Stucco ornamentation on the street face of the building was graphically translated by computer into a laser cutting process. The balustrade sheeting to the courtyard face was cut out without impairing the load-bearing function. The contrast between the dark-painted metal and the light-coloured, rendered facade evokes a sense of transparency and three-dimensional depth.


Related Topics in the Archive

all articles about Steel
   “Ultimately, it’s clarity I’m always ­looking for.” – A Discussion with ­Santiago Calatrava
  


Related Articles to this Region

about the country of Germany
   Munich


Related Topics on DETAIL.de

all articles about Steel
   Museum and archaeological park ‘Cabezo de la Almagra’
   DETAIL German/English 6/2010: Steel Construction





DETAIL 1+2/2003

Steel Construction

€ 11.00

>> order

Article for viewing in German / English

Download* Article in German / English

*Will be charged: 4.00 EUR, 3.00 EUR for subscribers

Advertisment

Language

Deutsch English Italiano Espanol Français

User Login

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 10.02.2012