State Office for the Conservation of Historic Monuments, Esslingen
documentation p. 344 - 347Architect Reutter, Odilo | Structural Engineer Meissnest, Heinz |
Drafts
1:20 Section through facade
1:2000 Site plan
1:500 Basement, Ground floor plan/Sections
1:20 Section through facade
1:2000 Site plan
1:500 Basement, Ground floor plan/Sections
The office is now accommodated in a former secondary school building with an extension structure. Although the latter is fully glazed on the outside, it was possible to execute the building without elaborate climate-control technology that would have obstructed the internal layout. A carefully designed lighting concept with fixed louvres in the cavity between the layers of double glazing also meets sunshading needs. In addition, the solid reinforced concrete floor slabs can be thermally activated to moderate extremes of temperature.
Related Topics in the Archive
all articles about Facade"Material Is Like Reading" - An Interview with David Adjaye
Haut Couture, Haute Facade - Tokyo's Facade Catwalk
Related Articles to this Region
about the country of GermanyEsslingen
Related Topics on DETAIL.de
all articles about FacadeCool Threesome
Article for viewing in German / English
Download* Article in German / English
*Will be charged: 5.00 EUR, 4.00 EUR for subscribers

[close]