Extension of the High Museum of Art in Atlanta
typology p. 940 - 941Architect Renzo Piano Building Workshop | Structural Engineer Ove Arup + Partners |
Drafts
1:1500 Sections
1:3000 Floor plans
1:50 Sectional detail of light scoop
1:1500 Sections
1:3000 Floor plans
1:50 Sectional detail of light scoop
Originally erected in 1926, the museum has undergone a number of extensions (the last by Richard Meier in 1983). Renzo Piano’s comprehensive reorganization now adds three new buildings, creating a “village for the arts”, the central urban element of which is a plaza flanked by the old and new structures. Two of the new buildings are for exhibition purposes and are linked via glazed pedestrian bridges with the refurbished wing of Richard Meier’s tract. The third structure by Piano houses the administration. At 29,000 m2, the museum area has been more than doubled. As in earlier museum projects by Piano, the development of a special daylighting system played an important role in the design. Here, 1,000 glazed roof elements bring natural light into the exhibition spaces below. North-facing “light scoops” allow only indirect light to enter, which is evenly distributed by specially shaped soffit units. Although only the upper floors receive daylight in this way, the form of the “scoops” is continued in the facade, lending the entire ensemble a striking appearance.
Related Topics in the Archive
all articles about MuseumThe Modern Museum: Formally staged or with Classical Rigour?
Dancing Rounds Soft Footedly: The Museum as a Place to Enthuse?
Related Articles to this Region
about the country of United StatesAtlanta
Related Topics on DETAIL.de
all articles about MuseumSan Telmo Museum in San Sebastián
DETAIL English 1/2012: Concrete, Brick, Stone
DETAIL German/English 12/2011: Architecture and Landscape
Article for viewing in German / English
Download* Article in German / English
*Will be charged: 4.00 EUR, 3.00 EUR for subscribers

[close]