ARCHIVE


Article from issue 10/2006 »Timber Construction«

House near Stuttgart

documentation    p. 1105 - 1108
Architect Hartwig N. Schneider Architekten |

Drafts
1:10 Horizontal section
1:10 Vertical sections
1:2500 Site plan
1:400 Floor plans
1:400 Sections

By offsetting the two sections of the house along a spine wall, it was possible to create a terrace screened from the neighbouring buildings and to integrate a large maple tree into the ensemble. On the enclosed upper floor, the wall divides the layout into two discrete areas: the children’s realm, and the parents’ separate bedrooms – each with its own staircase. The wall also functions as an upstand beam on this level, allowing the ground floor below to be opened over a broad front to the terrace. A tunnel ascends from the road to the basement garages. The prefabricated timber structure was erected on the basement in only three days. The internal finishings and facade were executed in situ.


Related Topics in the Archive

all articles about Timber
   Primitive Hut of the Future? Bionic Research Pavilion in Wood
   »Timber Wave« – The Construction of the Temporary Wooden Sculpture


Related Articles to this Region

about the country of Germany
   Kornwestheim


Related Topics on DETAIL.de

all articles about Timber
   DETAIL German/English 1+2/2012: Timber Construction
   From forest to city
   DETAIL English 6/2010: Timber Construction





DETAIL 10/2006

Timber Construction

€ 14.50

>> order

Article for viewing in German / English

Download* Article in German / English

*Will be charged: 5.00 EUR, 4.00 EUR for subscribers

Advertisment

Language

Deutsch English Italiano Espanol Français

User Login

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 08.02.2012