Article from issue 11/2006 »Eco-Refurbishment«

Attic Renovation in Munich

documentation    p. 1246 - 1249
Architect meck architekten | Structural Engineer Ingenieurbüro H.L. Haushofer |

Drafts
1:20 Vertical section
1:2000 Site plan
1:250 Floor plans
1:250 Section

The attic of a nineteenth-century apartment building protected under historic-preservation ordinances was remodelled and linked to the apartment below – nestled, as well, within a mansard roof – by a single flight of stairs. During the construction phase the entire roof was insulated, including the existing apartment.
The challenge was to make an airy, functional space out of the dark attic with its low, slanted ceilings, and at the same time, to fulfil the requirements specified by historic preservation. Large cuts into the roof were not permitted. The architects created a bright, loft-like space in which the original wood structure is still partially visible. The bathroom and the storeroom are cleverly hidden in black, light-frame structures.
The character of this new, additional living space is determined to a great extent by the four skylights. Firstly, they direct the ample light – using the maximum allowable surface area – into the room; secondly, due to the exaggerated reveals, they protrude beyond the roof surface, and as a result, provide additional ceiling height for the interiors. In this manner it is possible to utilise space underneath the sloped roof that would otherwise be wasted. The bathroom, in particular, profits from the special window construction: by incorporating oblique frames the architects optimised the amount of light passing through the aperture.
One aspect of the renovation of the intermediate ceiling-deck involved a concerted effort to increase the ceiling height. Because the original wood floor was partly warped and no longer functional, it was replaced by a new larch-wood floor. In order to arrive at an optimised assembly, instead of placing the joists which support the parquet floor on top of the existing beams – as would normally be the case – the architects specified that they be installed between them. Perlite infill reduces the noise caused by footfalls above. The heating system was integrated in a space-saving manner, as well: ultra-thin, wall-integrated heating elements are situated in the longitudinal walls.


Related Topics in the Archive

all articles about Eco-Refurbishment
   Taking a Second Look: Diocesan Museum in Eichstätt
   Spaces for a 21st century society – an interview with Toyo Ito


Related Articles to this Region

about the country of Germany
   Munich





DETAIL 11/2006

Eco-Refurbishment

€ 14.50

>> order
DETAIL ENGLISH 1/2007

Eco-Refurbishment

€ 15.89

>> order

Article for viewing in German / English

Download* Article in German / English

*Will be charged: 5.00 EUR, 4.00 EUR for subscribers

Advertisment

Language

Deutsch English Italiano Espanol Français

User Login

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 10.02.2012