ARCHIVE


Article from issue 5/2008 »Plastics«

Operations Building in Frutingen

documentation    p. 492 - 497
Architect Müller & Truniger Architekten | Structural Engineer Bächthold & Moor AG | Neue Holzbau AG |

The infrastructure centre, with workshop and fire station, was constructed to facilitate operating the new, 36 km long Lötschberg tunnel, but its halls were initially used as staging area for the tunnel construction. The two buildings – similar in volume but of varying lengths – lie next to the tracks, united by a common base. The overhangs emphasize the linearity. Despite their size, both halls blend in well with the surroundings, in part due to the outer skin of green, multi-wall polycarbonate sheets. During the day, the structural members are barely discernible, but at night they shine through the translucent facade. Two-pinned frames stabilize the hall along the shorter axis, and frame struts resist longitudinal loads.

Details
1:20 Horizontal section
1:20 Vertical section
1:20 Vertical section overhang
1:750 Floor plans
1:750 Sections
1:7500 Site plan


Related Topics in the Archive

all articles about Plastics
   Plastics: Ethereal Materials or Trash Culture
   Aqua-Scape in Japan


Related Articles to this Region

about the country of Switzerland
   Frutingen





German/English

DETAIL 5/2008
Plastics
€ 15.50

Other currencies Show shopping cart

English Edition

DETAIL ENGLISH 5/2008
Large Structures
€ 16.82

Other currencies Show shopping cart
Advertisment


Language

Deutsch English Italiano Espanol Sverige Japanese

User Login

DETAIL Subscription

subscribe now
>> more

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Most Wanted

Apartment Mound in Copenhagen

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 21.03.2010