First-Aid Posts in Marseille
documentation p. 1268 - 1271Architect Bonte & Migozzi Architectes | Structural Engineer GEPAC |
Drafts
1:20 Horizontal section
1:20 Vertical section
1:2000 Site plan type 1
1:250 Floor plan type 2
1:250 Layout plan type 2
1:250 Sections type 2
1:20 Horizontal section
1:20 Vertical section
1:2000 Site plan type 1
1:250 Floor plan type 2
1:250 Layout plan type 2
1:250 Sections type 2
The industrial port city Marseille has been working for decades to improve its municipal coastline. In the 1970s the Prado beaches were created through landfill. Four new first-aid posts provide the public beaches with security and a sense of identity. The pavilions are situated centrally on the respective beach segments, and emergency vehicles can drive right up to them. The larger part of the building contains the first aid post; the smaller part houses restrooms for the bathers. The open entrance zone between them offers a view of the sea. The 7 m long prefabrcated trusses were delivered by helicopter. Hydraulic cylinders are employed to tilt up large sections of the facade. When a station is not in use, the facade facing the city is completely closed.
Additional Informaton on DETAIL.de
First-Aid Posts in Marseille
Related Topics in the Archive
all articles about Timber ConstructionPrimitive Hut of the Future? Bionic Research Pavilion in Wood
»Timber Wave« – The Construction of the Temporary Wooden Sculpture
Related Articles to this Region
about the country of FranceRelated Topics on DETAIL.de
all articles about Timber ConstructionDETAIL German/English 1+2/2012: Timber Construction
Chapel in Tarnów, Poland
DETAIL English 6/2010: Timber Construction
Article for viewing in German / English
Download* Article in German / English
*Will be charged: 5.00 EUR, 4.00 EUR for subscribers



[close]