Sludge Towers of Munich 1 Sewage Works
documentation p. 346 - 350Architect Ackermann und Partner | Structural Engineer Obermeyer Planen + Beraten |
Drafts
1:20 Cross-section through bridge
1:20 Longitudinal section through bridge
1:20000 Site plan
1:50 Horizontal section
1:50 Vertical section
1:500 Floor plans
1:500 Section
1:20 Cross-section through bridge
1:20 Longitudinal section through bridge
1:20000 Site plan
1:50 Horizontal section
1:50 Vertical section
1:500 Floor plans
1:500 Section
This sewage works, Munich’s second-largest producer of renewable energy, demonstrates that industrial architecture and good design need be no contradiction. In the almost
50-metre-high prestressed concrete containers, organic substances are removed from the sewage sludge, and energy is generated from the resultant biogas. Thermal losses are minimized to achieve an ideal digestion temperature of 37 °C. The central staircase tower and the four 32-metre bridges serve as access routes and gas distribution runs. Despite the complications of obtaining building permission and the construction process, which covered a period of almost 10 years, it was possible to adhere to the cost parameters of € 63 million.
Related Topics in the Archive
all articles about CostsCost-Efficient Building Means Sustainable Building
Related Articles to this Region
about the country of GermanyMunich
Article for viewing in German / English
Download* Article in German / English
*Will be charged: 5.00 EUR, 4.00 EUR for subscribers



[close]