ARCHIVE


Article from issue 5/2009 »Materials and Finishes (also available as English Edition 4/2009)«

Gallery Building in Berlin

documentation    p. 457 - 464
Architect David Chipperfield Architects | Structural Engineer Ingenieurgruppe Bauen |

Drafts
1:20 Horizontal and vertical sections
1:20 Vertical and horizontal section
1:2000 Site plan
1:500 Floor plans
1:500 Sections

Erected by the collectors, Céline and Heiner Bastian, the new gallery building has a scuptural form and occupies one of the most prominent gaps in the urban landscape of Berlin. It is set on the bank of the river opposite the Museum Island. The restrained volumetric design of the gallery takes up the eaves height and coloration of the neighbouring historical buildings. For the seemingly monochrome facade, carefully cleaned light reddish-yellow bricks from demolished buildings were reused, laid in English bond with raked-out joints. Since there were to be no vertical expansion joints in the brickwork, the outer skin had to be at least 250 mm thick, so that any reactive forces caused by changes in temperature could be absorbed without causing cracks. The bays of brickwork are defined by large openings and on each storey by horizontal sand-blasted precast concrete strips with stone additives. These elements are divided by 5 mm abutment joints. Lateral movement in the brickwork is absorbed at the reveals and the ends of the building. Vertical forces are transmitted to the concrete strips on which the walls bear without sliding joints. On the other hand, along the topmost horizontal precast concrete element at eaves level, an expansion joint was necessary to absorb vertical movement and changes in height. The joints are reinforced at particularly critical points.
The architects and the company executing the work developed a special process for the facade coating: the wall was pointed and slurried in a single operation. Coloured lime mortar was applied over the face of the brickwork and worked into the joints before being partly removed from the surface with small trowels or metal scouring devices.
The large window openings are articulated by folding shutters and frames in ipe, a tropical wood that is robust enough to be left untreated apart from the smooth, planed finish.
Folding shutters made of plywood were also used internally as a means of preventing glare. Painted white or grey, the walls and most other surfaces in the gallery spaces communicate a sense of purity and noble
elegance.


Related Topics in the Archive

all articles about Materials
   Taking a Second Look: St. Pius Catholic Church in Meggen
   Thousand-Year Sheen – The Rediscovery of Glazed Ceramics


Related Articles to this Region

about the country of Germany
   Berlin


Related Topics on DETAIL.de

all articles about Materials
   DETAIL English 5/2011: Materials and Finishes
   100% Design in London
   DETAIL German/English 7+8/2011: Materials and Finishes





DETAIL 5/2009
Zoom in

Materials and Finishes

€ 15.50

>> order
DETAIL ENGLISH 4/2009
Zoom in

Materials and Finishes

€ 16.82

>> order

Article for viewing in German / English

Download* Article in German / English

*Will be charged: 10.00 EUR, 8.00 EUR for subscribers

Advertisment

Language

Deutsch English Italiano Espanol Français

User Login

Newsletter:

>> Archive

DETAIL Network

Profiles+ProjectsProfiles+Projects

Partner Links

About Detail | FAQ | GTaC | Imprint | Rate Card | Recommend this site | Sitemap

Detail, 10.02.2012