Skeleton as Envelope
- Claudia Hildner
How much existing fabric must be retained for a project to meet heritage protection requirements? Wutopia Lab's theatre in Suzhou tests the limits.
A former industrial hall was stripped down to its reinforced concrete frame. The theatre sits within it, enclosed by a folded envelope of green metal panels. © Liu Guowei