
Prefabricated laminated cross-boarded modules and wall elements plus the precast concrete units of the corridor construction were delivered and immediately hoisted into position in the building. A layer of timber plates on the concrete “table” over the ground floor ensures a level surface for stacking the modules.
Image credit: Götz Wrage