The steel structure was prefabricated in two parts, each weighing 24 tons, and painted. It was then transported by low-loader to Brussels and welded together on site. All surfaces that are to be walked across were given a white epoxy resin coating that harmonises with the painted steel surfaces and the seating steps.

The steel structure was prefabricated in two parts, each weighing 24 tons, and painted. It was then transported by low-loader to Brussels and welded together on site. All surfaces that are to be walked across were given a white epoxy resin coating that harmonises with the painted steel surfaces and the seating steps.

Image credit: MSA / Ney & Partners