
The steel structure was prefabricated in two parts, each weighing 24 tons, and painted. It was then transported by low-loader to Brussels and welded together on site. All surfaces that are to be walked across were given a white epoxy resin coating that harmonises with the painted steel surfaces and the seating steps.
Image credit: MSA / Ney & Partners