In the ceilings, glued laminated timber elements alternate with prefabricated concrete elements. An in-situ concrete top layer was poured onto the slabs.

In the ceilings, glued laminated timber elements alternate with prefabricated concrete elements. An in-situ concrete top layer was poured onto the slabs.

Image credit: Philip Heckhausen