A recessed grid was milled into the OSB ceiling elements in the workshop. Once the top layer of concrete was added on site, the result was a shear resistant connection.

A recessed grid was milled into the OSB ceiling elements in the workshop. Once the top layer of concrete was added on site, the result was a shear resistant connection.

Image credit: Waechter + Waechter