The triple gymnasium was planned in conjunction with the special needs school of the Miesbach district, based on the competition entry. It is designed as a shared school, sports, and leisure facility. The gymnasium, with a clear opening of 27/45/7 m, was sunk one story into the terrain to achieve the necessary level of load-bearing soil, which lies 3 m below ground level, while simultaneously preserving the scale of the existing landscape and surrounding buildings.
