Lausanne Office Building

The exterior wall construction: Brackets were embedded in the concrete ceiling slabs to anchor the wall. Steel profiles form the vertical framework, which is mounted to the anchoring elements; these are clad with profiles and folded metal sheets (the cavities behind these claddings are filled with insulating hem material). The double-glazed units were installed using insulated aluminium profiles.

Lausanne Office Building