The ticket office, a workroom, and electrical equipment were to be housed in a pavilion designed to be as transparent as possible. A fixed-glazed display case with removable back panels is located on the street side. The overhanging roof provides weather protection. The pavilion can be dismantled and re-erected elsewhere. The floor plan beneath the roof, which rests on steel columns embedded in concrete foundations, was to be developed independently of the supporting structure.
