Based on thorough investigations, this group of buildings was erected using a specially developed prefabricated construction system. The preliminary investigations, some aspects of which could not be fully adhered to during execution, initially yielded the following results: 1. It is impossible to design and sufficiently clarify prefabricated construction prototypes within the preparation time normally available for a specific construction project and with the allocated budget, especially since material, manufacturing, and assembly trials are also required.
