The images on this page show further details of the construction of the repair workshop at the Zurich waste incineration plant (see also the overall view on the previous page): 1. Detail of a corner section with an adjoining steel ladder leading to one of the external access platforms on the upper floor. 2. Detail of the exterior wall at the stairwell with vertical Durisol panels. 3. Interior detail of the steel structure with Durisol roof panels. 4. Section of the window area on the main facade. The change in colours distinguishes the individual parts of the structure: blue steel structure, white windows, grey Durisol panels.
