Isarphilharmonie Cul­tural Centre in Munich

 - Stephan Schütz

The modular construction type allowed gmp Architekten to quickly create a temporary replacement for the existing Gasteig cultural center, in need of renovation. At the same time, the prefabricated timber elements meet the high acoustic requirements for a concert hall.

Isarphilharmonie Cul­tural Centre in Munich
Inside the concert hall, the prefabricated cross laminated timber elements remain visibly exposed. Their black glazed finish provides discreet elegance and contrasts with the light coloured parquet flooring. © HGEsch