Heide Wessely

  • European School in Frankfurt

    The client initially specified a container school as temporary facility for the children of employees of the European Central Bank and banking oversight. But the architects didn’t warm to the idea and developed a concept for wood modules, which can also quickly be erected. This addition has a completely different look from the steel boxes that also hold classrooms: the latter have been in use for quite a while, because the school is bursting at the seams. The building permit is limited to five years: the city wants the option to build a beltway across the site – though this is unlikely, because it would require tearing down the main building. Thanks in part to the carpentry firm’s commitment, the school doesn’t appear to be temporary. A technological innovation was the use of structurally high-performing beechwood LVL. The surfaces are exposed: they go well with the partition walls’ softwood surfaces. Wood-wool acoustic ceilings subtly point out the temporary nature of the school, but there are no such cues in the classrooms, which consist of three 3 × 9 metre modules. The individual modules are recognisable both inside and outside, but are not predominant. In the ceilings they look like downstand beams. The vertical joints were sealed, making two units appear to meld. The design did not rigidly adhere to the idea of prefabrication: each decision carefully weighed to which extent a component should be prefabricated.

  • Goat Shelter in Seubersdorf

    The lucid design for a shelter for the architect’s own goats employs simple and cost-effective means. The small structure on a dry grassland in Oberpfalz, a district in Bavaria bordering the Czech Republic, is pared down to the minimum: off-the-shelf dimensional softwood lumber was assembled using an air nailer. Floor and ceiling consist of lumber of the same dimensions, and a simple waterspout drains the roof.

  • Residence in Melbourne

    The challenges associated with planning a house on a 17 × 6 m site became acute when the historic preservation department denied permission to tear down the existing cottage. The facade facing the street was retained, the interior gutted; built-in cabinets and two skylights were installed. The addition was erected in concrete, metal and glass: it occupies the rest of the property. Access to the new structure is had via a small patio flanked by concrete walls. The courtyard walls are generously glazed. To ensure that the spaces in the new structure receive ample daylight, Godsell equipped them with a glazed roof. Shading is provided by automated panels; when they are closed the surface functions as a roof terrace.

  • Housing and Commercial Development for a Construction Group in Berlin

    In 2009, a consortium consisting of three architectural practices was the only group to make an offer for the more than 2,000 m² derelict site in Kreuzberg, Berlin. The contaminated soil, the proximity of the site to an above-ground metro line and the dubious establishments in the neighbourhood had deterred investors. Nor was it certain how this former border area between West and East Berlin would develop. The architects nevertheless accepted the risk.

  • Apartments in Los Angeles

    The Star Apartments near the centre of Los Angeles are not a luxury housing scheme, as the name might suggest. They are dwellings for people of low income and who formerly belonged to the long-term homeless. Here, 102 dwelling units manufactured in Idaho and transported to the site by truck have been stacked in dynamic fashion up to six storeys in height. This construction is borne by a concrete deck supported by powerful piles that conduct the loads into the ground below. The piles penetrate a single-storey existing structure that the architects built over instead of demolishing. This former commercial structure is used by the new residents as well as people living in the neighbourhood. Accommodated in this section is the public health office with a clinic and health centre. The facilities provided here include psychological consultancy, health care and wellbeing, and case management.

  • Housing Development with Event Hall in Berlin

    In this project, which took more than eight years to complete, it was the wish of the clients to have a second dwelling in the city. In 2006, a 900 m² site was found just behind the former border to East Germany, and housing as a cross-border cultural exchange became the underlying idea. The outcome was a building that unites various functions, outstanding among which is a leasable hall equipped with modern stage technology for various events, including seminars, conferences and theatrical performances of many different kinds, with a communal kitchen, and a dining hall and courtyard for the users. They can also spend the night there in small rooms – that recall Japanese ryokans – on the floor above.

  • Apartment Building in Munich

    Schwabing is one of Munich’s most popular neighbourhoods, but it too has its difficult locations, such as Belgradstrasse, a busy street with heterogeneous urban fabric. Partly on account of the neighbouring transformer station and the subway tunnel, the site had been vacant for a number of years. The owner, the City of Munich, decided to erect a building combining subsidized housing and a hub for street-cleaning equipment. The special feature is a generously scaled veranda-like circulation cloaked in a grey stucco facade. It not only plays a role in the circulation, but also creates a buffer between the loud city and the individual sphere of privacy. As if in a theatre box, residents may survey the activity on the street below, while at night, as soon as the yellow wall is illuminated, they change from members of the audience to performers. Then the “luminaire” becomes a stage set. Openings cut out of the floors furnish vertical views. The entrances to units are paired, a situation that fosters neighbourly relations. All 28 apartment units are wheelchair accessible; some have the option to annex a neighbouring unit. The architects achieved a high standard by inventively employing inexpensive building materials such as the simple basement lights in the street-cleaners’ break room, or by exposing ductwork in the two-storey subterranean parking garage. On the ground floor a variety of amenities – including an outdoor break space – are available to the fifty employees.

  • Residence in Neusäß

    Heavyweight construction is not the only method employed here: this home is a hybrid. Although the stucco-covered structure brings to mind a pebble set in the landscape, only its core is of concrete. Its outer shell consists of a layer of cellulose (depth: 32 cm) and a wood loadbearing structure. The design with a 10 × 10 m footprint makes use of passive climate control, has no basement, and is equipped with a heat pump, mechanical ventilation and panel heating. The large windows and facets are visible from afar. The idea behind the form: in order to attain the best possible ratio of area to volume, the architects sought to approximate a sphere. The placement of the windows takes into account the position of the sun. The panes – at nearly 10 m² each – supply significant solar gains, while the core acts as thermal storage. For natural ventilation there are small opaque apertures and the large sliding doors on the ground floor. The approach to the design could almost be considered pragmatic, yet creates astonishing results inside. The combination of obliquely cut edges, slanted ceiling surfaces and radial walls emanating from the stairwell, and large surfaces of glass bestows the compact house a sense of spaciousness. The entrance hall profits from the decision to do without a vestibule. Ornamental perforation – which is derived from the floor plan – creates a play of light on the floor and ceiling. From the entrance hall, the stair, following the terrain, leads down to the living room. At its narrowest point the latter is only 2.10 m wide. But because it becomes wider toward the middle, adjoins the kitchen and the entrance hall, and has expansive openings, the space is anything but cramped. When the light is right, the pebbles in the concrete surfaces, brought to the fore by the bush-hammer, start to sparkle.

  • Astley Castle in Nuneaton, Warwickshire

    Astley Castle served as a place of residence for more than eight centuries: it was first chronicled in the thirteenth century as the country seat of the Astley family. The oldest remaining walls date to the 11th century; over the years, numerous additions were made to that rectangular core.

  • Office Building in Milan

    Most Milanese are familiar with Palazzo Campari, an office building planned by Ermenegildo and Eugenio Soncini. Upon completion in 1964 it was considered ultra-modern and technologically innovative, but no longer meets contemporary standards: it has a high ratio of non-programmed spaces and rigid organisation of the office levels.