Jakob Schoof

Seit 20 Jahren befasst sich der stellvertretende Chefredakteur von Detail mit der medialen Vermittlung von Architektur. Nach dem Architekturdiplom 2000 an der Universität Karlsruhe absolvierte er ein Volontariat bei der Architekturzeitschrift AIT und war dort als Redakteur und Leiter Corporate Publishing tätig. 2009 stieß er zu Detail, wo er unter anderem die Zeitschriften-und Buchreihe Detail Green zum nachhaltigen Bauen und die Zeitschrift structure zu Themen der Tragwerksplanung verantwortet hat.

  • The German School in Madrid

    The new German School in Madrid was conceived as a cluster of buildings largely pentagonal on plan and with a honeycomb layout. A consistent range of materials was used for the structures, namely white concrete, glass and aluminium. The kindergarten, the primary and secondary schools accommodate 1,640 children. There is also a dining hall for approximately 400 pupils, a four-part gymnasium and a hall for 700 persons that is used for public events as well. The school buildings are accessible mainly from the courtyards, with the internal spaces oriented to the landscape. The two covered courtyards have their own individual faces with aluminium grid structures inspired by Moorish architecture. The load-bearing facades to the classroom tracts consist of precast V-shaped column supports and concrete upstand beams (parapet walls) with sloping tops set on the in-situ floors. Reinforcement for the upstand beams was incorporated in the floors. The facade columns in white concrete were then assembled on top, and in a third stage, the parapet walls were constructed in self-compacting in-situ white concrete. An additive in the in-situ elements prevents the penetration of water.

  • Extension of a School and Community Centre in Belmont-sur-­Lausanne

    Increasing numbers of pupils and the recently introduced programme of all-day schooling necessitated an extension of the school and municipal centre in Belmont-sur-Lausanne. Originally erected in 1973 and enlarged in 1999, the development stands on a west-facing slope roughly two kilometres from Lake Geneva. With the present extension, the architects have created a closure at the southern end of the complex and a new main entrance with access from the village centre via a covered play area. The mixed spatial programme includes two dwellings, an air-raid shelter, classrooms, a dining hall with day-care facilities, a gymnasium and a new pellet heating system for the entire school centre.

  • Report: Refurbishment of and Addition to the Unterlinden Museum in Colmar

    With a population of nearly 70,000, Colmar is the third largest city in Alsace. It is home not only to picturesque taverns and timber-framed structures, but also to one of the greatest treasures of the late middle ages. The Isenheim Altarpiece - which Matthias Grünewald painted exactly 500 years ago for a monastery of the Order of St. Anthony located just south of Colmar - has been on view since 1853 at the Unterlinden Museum. The refurbishment of and addition to the museum was completed in time for the jubilee. Herzog & de Meuron and their French partner architects DeA and Richard Duplat have carefully brought the Dominican convent up to contemporary standards - and, in the process, revealed layers of earlier periods. The plasterboard covering the dark beams has been removed, the church windows were refurbished, and a new wood floor was laid in the former convent church. The latter contains the altar. New wood doors grace the entrances, and there is new beaver-tail tiling on the roof. In addition to the refurbishment of the convent, the scope of the 44-million-euro project included the construction of two new buildings and the refurbishment of a former art nouveau swimming pool. These measures have nearly doubled the floor area accessible to the public: it is now 8000 m2. Above all the painting collection - which includes works by Monet, Dubuffet and Picasso - now has significantly more space. And there are two new halls for temporary exhibitions and events. Moreover, the citizens of Colmar have had a public space returned to them that had served as bus stop and parking lot. Place d'Unterlinden is now the heart of the museum complex; from here one also has access to the adjacent convent and the museum addition. The architects reinterpreted the convent complex in an attempt to instil tranquillity. The idiosyncratic brick pavilion with hip roof symbolises this quest. Its form and volume make reference to a mill that stood here centuries ago. Like a lantern hung from the eaves - but, in this case, on the ground - it supplies daylight to the underground passage connecting the museum to one of the additions. It has two windows, but no door. It is the public face of an otherwise hidden museum. Herzog & de Meuron used a similar symbol in 2003 at the entrance of the "Schaulager" in Basel. In both cases, a small structure draws attention to larger halls nearby that have the same palette of materials. In Colmar, the so-called "Ackerhof", a 3-storey structure, makes up the larger part of the newly built massing. The lower two levels accommodate the museum's department of modern art. The top floor, with a ceiling height of 11.5 metres, hosts temporary exhibitions. Its volume corresponds to that of the existing convent church. The facades are clad in hand-broken, small-format coring bricks: the raw edges are turned outward. The roof and the short end of the building are sheathed in standing-seam copper. These materials are new to the site, but harmonise with the convent's yellow and rust-red sandstone. The open spaces between the additions to the museum remind us that monasteries and convents are not only places of contemplation, but were also dedicated to self-sufficient existence. With this in mind, the architects created a courtyard enclosed by brick walls and containing an apple orchard: the "pomarium".

  • Visitor Centre in Middelfart

    Situated in the far west of the island of Funen, the Hindsgavl Nature Reserve is a verdant oasis in one of the most densely populated areas of Denmark. The nearby municipality of Middelfart commissioned this new visitor centre for the many mountain bikers, hikers, scouts and other groups who make extensive use of the sanctuary. The new structure, with its radial layout, was designed by AART architects in close cooperation with future users.

  • Civic Centre in Visegrád

    Situated on the River Danube 40 kilometres north of Budapest, Visegrád is a border town that was formerly a royal frontier fortification. Although it has a population of only 1,800, it was accorded urban status in the year 2000, since when it has been what is probably the smallest town in Hungary. The annual palace festival, with knightly jousting in the medieval tradition, recalls the historical significance of Visegrád even today. With the beginning of the new millennium, the town fathers forged bold new plans for the redevelopment of the civic centre in the meadows along the Danube, which form the setting for the festival. In 2008, an architectural competition was held, which was won by aplusarchitects. Within a short time, however, the international financial crisis caused the budget and the construction programme to be drastically cut. Ultimately, all that was implemented was a new pavilion for various events and an extension of the local health centre in the form of an open staircase oriented to what was once the village square. The new structure and the extended health centre match each other in their form and use of materials. Both are elongated, barn-like buildings with double-pitched roofs and larch-clad facades. The staircase cladding consists of open louvres screwed to the supporting structure, while the outer skin of the pavilion varies according to the internal function.

  • Community Centre in Aalst

    For many years, the presbytery garden in Moorsel, which belongs to the municipality of Aalst, was a hortus conclusus for the village priest. But that changed when a new community centre was erected here with a large multipurpose hall and a youth club. The layout of the buildings reflects the topography, which falls away by about seven metres towards the east. The architects located the multipurpose hall at the highest point, next to the former presbytery (a listed building). The hall is accessible both from the street via a forecourt, and from the garden via a storey-height glazed front. The youth club at the south-eastern end of the site, though of a more private character, also has two entrances: to the group rooms on the upper level from the park and to the lower level from the street. Between the hall and the youth club is a terraced open area with seating and a small stage – an area the architects refer to as the “tree space”. In a style characteristic of Mies van der Rohe, internal and external spaces are linked by means of storey-height exposed-concrete walls and anthracite-coloured steel framing that form the load-bearing structure of the new buildings, while also creating a kind of pergola. In addition, the concrete walls separate the geometric “tree space” from the historical park. A third unifying design element can be seen in the deep, closely spaced timber beams, between which, scarcely visible, the lighting and ventilation runs are integrated.

  • Report: Refurbishment and Extension of the National Theatre in London

    Theatre foyers are like the decks of excursion boats: they encourage strolling and conversing; they are the stages upon which the pageantry of societal life unfolds. The National Theatre in London, one such steamer in exposed concrete moored on the southern bank of the Thames in the mid-1970s by the British architect Denys Lasdun (1914 – 2001), illustrates these parallels. In his conception of the building as a place for people to come together, Lasdun not only included generously dimensioned foyers, but also numerous roof terraces.

  • Experimental House in Stuttgart

    Situated opposite Mies van der Rohe’s multistorey housing development in the Weissenhofsiedlung, this experimental B10 house, which derives its name from the address, Bruckmannweg 10, is based on Werner Sobek’s “Triple Zero” concept: it seeks to achieve a positive energy balance, not to cause harmful emissions and – in the event of a later demolition – not to result in waste material. The single-storey structure can be used as a dwelling or an office. Closed on three sides, it opens on to the street to the west with a fully glazed entrance front. In the event of a longer absence of the residents, the terrace can be folded up in front of the glazed facade, thus helping to reduce heat losses and to prevent break-ins. Disturbance of the subsoil had to be kept to a minimum, so the B10 house is borne by a grid of steel beams set on eight steel point foundations that can be adjusted in height by screw connections.

  • Storage building, 1987

    Seven Buildings for Thirteen Herbs – Ricola and Herzog & de Meuron

    Six times in the past, the confectionery manufacturer Ricola and the architects Herzog & de Meuron have collaborated to build, most frequently at the sweetmaker’s headquarters in Laufen south of Basle. The present structure, the seventh, is the largest to date, with a length of 111 m, a width of 29 m and a height of 11 m. In 2006, Ricola moved its production plant from the heart of Laufen to the periphery. The planar facades of this new herbal centre consist basically of rammed earth, excavated within a radius of 10 km and worked nearby to create large prefabricated elements. The interior is naturally lit by roof lights and four large circular windows – one in each facade. The 5.50 m diameter of these openings accounts for their unusual form. Since earth cannot resist tension or bending stresses, concrete lintels would have been necessary over windows of this width. With circular openings, however, almost exclusively compression loads occur along the jambs, and the compacted earth is perfectly capable of bearing these. Only the entrance gates were designed with lintels, but these are not visible from the outside. The windows themselves are anchored in the prefabricated earth elements. Nearly 670 of these large-scale units – on average 3.36 m long, 1.30 m high, 45 cm thick and weighing up to five tonnes – were required for the 3,060 m² facade area. In the production and erection of the external walls, Herzog & de Meuron worked closely with the Vorarlberg earth construction specialist Martin Rauch. The facades are self-supporting, but are anchored at the back to a concrete skeleton frame. With its 55 × 55 cm columns, this transmits wind and roof loads to the ground as well as providing earthquake resistance. Centrally behind each of the circular windows stands such a concrete column, where the external walls are least stable.