• Deutsch
Log inSubscribe
DETAIL
TopicsProjectsShopEvents
  • Projects 5,503
  • Articles 2,246
  • Images 76,980
  • Drawings 2,689
All Filters 1
Building type / function
Building type / function
  • Education and research1
  • Government and municipal buildings1
  • Hotels and restaurants1
  • Interiors1
  • Library, media centre1
  • Mixed use1
  • Office and administration2
  • Residential4
  • Trade and commercial use1
Task
Task
  • Conversion / Refurbishment2
  • New construction10
Facade material
Facade material
  • Concrete1
  • Fabric/membrane/foil1
  • Glass7
  • Masonry (brick, clinker, sand-lime brick, etc.)1
  • Metal3
  • Wood2
Load bearing structure
Load bearing structure
  • Hybrid, composite construction1
  • Masonry1
  • Reinforced concrete5
  • Steel4
  • Timber4
Room type
Room type
  • Corridor, circulation space3
  • Office1
  • Stairwell4
Elevator
Other building elements
  • Access balcony144
  • Balcony door/terrace door267
  • Balcony, loggia592
  • Balustrade, railing565
  • Bay window32
  • Building services, ductwork, wiring140
  • Canopy288
  • Door, gate, entrance508
  • Elevator17
  • Garage, carport23
  • Light ceiling, daylight ceiling71
  • Ramp13
  • Roof construction256
  • Roof window, skylight432
  • Stairs726
  • Sun protection (venetian blinds, awning, curtain, brise-soleil)365
  • Terrace, roof terrace359
  • Window1,164
Flooring
Flooring
  • Screed, concrete2
  • Tile, natural stone1
  • Wood4
Wall surface
Wall surface
  • Glass1
  • Painted finish, coloured coating2
  • Render1
Ceiling surface
Ceiling surface
  • Glass1
  • Insulation, wood wool lightweight panels1
  • Metal1
  • Painted finish, coloured coating1
Reset filters (1)

17 results

Date (newest first)
  • Relevance
  • Date (newest first)
  • Date (oldest first)
Das Bauen mit Ziegelfertigteilen basiert auf einem durchdachten System: Im Werk werden großformatige Wandelemente aus Ziegeln vorgefertigt – passgenau nach den individuellen
Anforderungen des jeweiligen Bauprojekts. Durch die industrielle Vorfertigung werden Bauzeiten deutlich verkürzt, witterungsbedingte Verzögerungen minimiert und der Bauablauf insgesamt
effizienter gestaltet.
Manufacturer Lutz Aufzüge had to comply with all current regulations when refurbishing this 1908 elevator.
Removable Courthouse
To conserve available space, the architects placed the staircase and the elevator shaft in front of the southern facade. Their steel skeleton supports balconies and access balconies seamlessly.
Saxo Bank headquarters, Hellerup, Denmark, 2008
The certified standard solution for wooden lift shafts from Schindler was first used in a Berlin primary school three years ago.
In TK Elevator’s Twin elevator system, two cabins travel independently in a common shaft.
The generous lobby provides access to the parking garage from the street and from the roof. Following in-depth research, the architects selected hues from the original colour scheme.
Puukuokka Residential Complex in Jyväskylä

12 results

DETAIL

The DETAIL ARCHITECTURE GmbH is a leading international platform for design and construction solutions in architecture.

Shop

  • Subscription
  • Magazine
  • Single Issues
  • Books
  • Collection

Legal

  • Legal Notice
  • Privacy Policy
  • Terms & Conditions
  • Cancellation/Withdrawl

About DETAIL

  • About us
  • Contact
  • Editorial Team
  • Working at DETAIL
  • Media kit

Newsletter

Stay up-to-date with the world of architecture through the DETAIL Newsletter.


Copyright © 2026 DETAIL. All rights reserved.