Striking glued timber skeleton

Wooden House near Den Haag by Derksen Windt Architects

 - Jakob Schoof

The residential building by Derksen Windt in Monster, a coastal suburb of Den Haag, displays how it was built: with a load-bearing skeleton in glued laminated timber.

Wooden House near Den Haag by Derksen Windt Architects
© René de Wit

The residential building by Derksen Windt in Monster, a coastal suburb of Den Haag, displays how it was built: with a load-bearing skeleton in glued laminated timber. The plot – a few hundred metres from the North Sea and about 10 km southwest of the downtown Den Haag – was designated as agricultural land and thus not meant to be built on at all, but as there were already other residential buildings in the vicinity, the architects and their client managed to persuade the local authorities to reclassify it as building land.

© René de Wit

And while the new house was not to exceed the others in height – namely two storeys at the most – the architects were given relatively free hand. In this they gave the house a timber skeleton design incorporating a load-bearing structure of 300 mm glued laminated larch columns clearly visible on the facades.

The wall elements in-between consist of larch panels set back markedly from the columns and are thus only of minimal thickness. For such cases the architects decided on thermal insulation in the form of phenolic foam capable of a lambda value of 0,018 W/mK.

© René de Wit

The facade elements were partially prefabricated, but the insulation and exterior facing were installed later on site. The indoor walls are mostly in plasterboard. Stone tiling and wooden parquetry have been used on the floors; the ceilings in cross-laminated timber with a scumbled finish in white have no further surfacing.

© René de Wit
© René de Wit

Four people altogether live in the house, in which the bedrooms and bathrooms are situated in the two-storey wing and the open living and dining area in the single-storey one. Both of the flat roofs are greened. The higher one is also topped by a photovoltaic system, which supplies electricity to the heat pump heating system, thus making the house, according to the architects, a zero energy building.


Architecture: Derksen Windt Architecten
Client: privat
Location: Plaats Langeveld, Monster (NL)


Structural engineering: Pieters Bouwtechniek
Contractor: Ernst Abbas


  • At the last Detail Award in 2025, Esch Sintzel Architekten won one of the three main prizes for their conversion of a wine warehouse in Basel into flats. This year, Detail is introducing a separate category for affordable housing as part of the award.

    Great Architecture on a Small Budget 

    2027 brings a new edition of the Detail Architecture Award - and, for the first time, a prize for affordable housing. Entries close end of October.

  • The new seven-storey building on Hohlstrasse in Zurich will comprise a ground floor with retail space and public service areas, and five upper floors with commercial space.

    Railway Tracks as a Supporting Structure - How Does That Work? 

    Around 180 kilometres of track are replaced every year on the Swiss rail network. Until now, all this scrap metal has been melted down. However, the first building with a steel framework made from recycled rails will soon be constructed in western Zurich.

  • Landscape architect Line Ramstad is the new chief curator of the Oslo Triennale.

    „One Size Does Not Fit All" 

    Facades made from waste wool, recycled steel from decommissioned ships, housing rather than investment property: Line Ramstad, chief curator of the Oslo Triennale, shows what happens when nature takes precedence.

  • Paul Van Ostaijen Culture Campus in Leuven

    Lava architecten transformed an old mission building in Leuven into a place where circus arts, music, theatre, and dance coexist under one shared roof. Effective soundproofing is the precondition for the shared use of the facility.

  • Even though the main exhibition pavilion in the Giardini was closed, the 2025 Architecture Biennale featured more exhibits than ever before.

    Self-Exploitation in the Celebrity Circus

    At every Architecture Biennale, the curators face the same obstacles: a lack of funding, a great deal of red tape, and an organisation that ignores collective achievements. Why do they put themselves through this? We speak to Albena Yaneva, who spent a year observing the development process of the 2025 Biennale.

  • A vision for the future of Barcelona: Boltshauser Architekten have designed demountable street furniture made from concrete blocks for the Catalan metropolis. The blocks are made from recycled lean-mix concrete layers under roads.

    An End to Downcycling  

    In its current form, concrete recycling does little to help climate protection. The CO₂-intensive cement is lost irretrievably in the process. Boltshauser Architekten are working with a consortium from the Netherlands, Switzerland and Spain on the Respira research project to investigate how this can be avoided.