Resource-saving renovation

Addition to an Old Townhouse in Linz by Mia2

 - Frank Kaltenbach

In renovating and expanding an old townhouse in Linz, the architects from Mia2 were able to reuse many building components.

Addition to an Old Townhouse in Linz by Mia2
© Kurt Hörbst

In renovating and expanding an old townhouse in Linz, the architects from Mia2 were able to reuse many building components. The truth is that the dilapidated 16th-century townhouse on Lederergasse in Linz was slated for demolition. However, Sandra Gnigler and Gunar Wilhelm decided to acquire the building in order to use it as a pilot project for a resource-saving renovation involving much of their own work. They also planned to use the house as their architecture studio. Several building phases aimed at enlarging the building by two-and-a-half storeys in wood-building techniques have added 10 apartments to the structure.

© Kurt Hörbst

The first phase involved dehumidifying the damp masonry in the foundation area using heat pipes and dismantling the existing floor slab. The architects used the earth beneath the floor as a source of clay for prefabricated wall elements of rammed earth. These elements had to be stored for two years before they could be installed as the load-bearing wall of the rooftree. The new floor slab is insulated with cellular glass against the soil.

The new floor slab is insulated with cellular glass against the soil. The architects replaced the existing windows with thermally insulated box windows featuring muntins in keeping with the building’s historical appearance.

© Kurt Hörbst

Renovation of the upper levels could take place only once the tenants’ lease agreements had expired. It was possible to preserve the undersides of the original wooden ceilings on the upper storeys by upgrading them with concrete-and-timber constructions.

© Kurt Hörbst
© Kurt Hörbst

The existing saddle roof was removed and replaced with a two-and-a-half-storey addition with a new saddle roof, large dormers and a covering of sheet metal. The old tiles have found new life as the roof of a barn in the surrounding area.

© Kurt Hörbst

In order to make the best possible use of the limited space in the existing walls, a facade-side spiral stairway made of bespoke prefab concrete components has replaced the steep interior staircase. The apartments are compact, but have gained communicative balconies that rest on a delicate-looking steel construction and face the planted inner courtyard. The highlights of this resource-saving densification project are the attic-level maisonette units with a view over the Old Town of Linz.

Read more in Detail 1/2.2023 and in our databank Detail Inspiration.


Architecture, landscape architecture, interior design, construction management: mia2 Architektur
Client: Sandra Gnigler und Gunar Wilhelm
Location: Lederergasse 24, Linz (AT)


Structural engineering: Kotlaba (baustatik.at)
HVAC planning: Peter Bönisch Installationsges.m.b.H.
Building physics: Wolfgang Holzmann
Contractor: Simader Baumeister und Zimmermeister
Heating and cooling technology: Ke Kelit
Facade cladding, facade elements: Röfix
Windows, skylights, doors glazing works: Elmer
Roofing: Uginox
Sanitary equipment, fittings: Geberit, Duravit, Laufen
Flooring: Forbo Flooring Austria
Interior wall finishes: Knauf


  • "A White Box is the Most Aggressive Form Anyone Can Design"

    Known for its bold use of colour and material contrasts, the Porto-based practice fala is now bringing that same approach to social housing, says co-founder Filipe Magalhães.

  • At the last Detail Award in 2025, Esch Sintzel Architekten won one of the three main prizes for their conversion of a wine warehouse in Basel into flats. This year, Detail is introducing a separate category for affordable housing as part of the award.

    Great Architecture on a Small Budget 

    2027 brings a new edition of the Detail Architecture Award - and, for the first time, a prize for affordable housing. Entries close end of October.

  • The new seven-storey building on Hohlstrasse in Zurich will comprise a ground floor with retail space and public service areas, and five upper floors with commercial space.

    Railway Tracks as a Supporting Structure - How Does That Work? 

    Around 180 kilometres of track are replaced every year on the Swiss rail network. Until now, all this scrap metal has been melted down. However, the first building with a steel framework made from recycled rails will soon be constructed in western Zurich.

  • Landscape architect Line Ramstad is the new chief curator of the Oslo Triennale.

    „One Size Does Not Fit All" 

    Facades made from waste wool, recycled steel from decommissioned ships, housing rather than investment property: Line Ramstad, chief curator of the Oslo Triennale, shows what happens when nature takes precedence.

  • Paul Van Ostaijen Culture Campus in Leuven

    Lava architecten transformed an old mission building in Leuven into a place where circus arts, music, theatre, and dance coexist under one shared roof. Effective soundproofing is the precondition for the shared use of the facility.

  • Even though the main exhibition pavilion in the Giardini was closed, the 2025 Architecture Biennale featured more exhibits than ever before.

    Self-Exploitation in the Celebrity Circus

    At every Architecture Biennale, the curators face the same obstacles: a lack of funding, a great deal of red tape, and an organisation that ignores collective achievements. Why do they put themselves through this? We speak to Albena Yaneva, who spent a year observing the development process of the 2025 Biennale.