A green educational environment

School Campus near Groningen by De Unie Architecten

 - Kim Krück

Together with Felixx Landscape Architects, De Unie Architects are realising a school campus for several educational institutions that offers a varied learning landscape on 4 ha.

School Campus near Groningen by De Unie Architecten
© Egbert de Boer

Together with Felixx Landscape Architects, De Unie Architects is realising a school campus for several educational institutions in Appingedam, 30 km north-east of Groningen. Covering an area of 4 ha, the diversely designed learning landscape offers sufficient space for practical training and sports in addition to three secondary schools.

© Egbert de Boer

A village structure

The design of the campus is based on historical villages whose radial arrangement protected them from floods. The Eemsdelta campus has taken up this layout. Each school has its own individual building that is directly linked to the central courtyard, which serves as the main entrance for all areas and allows the surrounding landscape to flow into the centre of the campus.

The central courtyard

The central courtyard is home to the Tree of Knowledge, which is the heart of the campus. The courtyard itself is divided into two levels connected via a rounded stairway. When events take place, this stairway can be used as seating. The ground-floor level acts as a schoolyard and access space, and a tranquil garden with outdoor classrooms can be found on the roof.

© Egbert de Boer

A multifaceted landscape

The surrounding landscape is divided into various subject areas. There is space for learning and research. A gardening nursery, a workshop, a pond and sports fields offer students the opportunity to try things out. The park landscape is shared with local residents and adds value to the neighbourhood. The early participation of all future users in the planning phase meant that everyone’s needs could be considered as much as possible.

© Egbert de Boer

The resulting green educational environment will bring the generations to come closer to nature and have a positive influence on the children’s development.


Architecture: De Unie Architekten
Client: Municipality Appingedam, ROC Noorderpoort, Stichting Voortgezet, Onderwijs Eemsdelta
Location: Appingedam (NL)


Landscape architecture: Felixx
Building services engineering: Alferink van Schieveen


  • The new seven-storey building on Hohlstrasse in Zurich will comprise a ground floor with retail space and public service areas, and five upper floors with commercial space.

    Railway Tracks as a Supporting Structure - How Does That Work? 

    Around 180 kilometres of track are replaced every year on the Swiss rail network. Until now, all this scrap metal has been melted down. However, the first building with a steel framework made from recycled rails will soon be constructed in western Zurich.

  • Landscape architect Line Ramstad is the new chief curator of the Oslo Triennale.

    „One Size Does Not Fit All" 

    Facades made from waste wool, recycled steel from decommissioned ships, housing rather than investment property: Line Ramstad, chief curator of the Oslo Triennale, shows what happens when nature takes precedence.

  • Paul Van Ostaijen Culture Campus in Leuven

    Lava architecten transformed an old mission building in Leuven into a place where circus arts, music, theatre, and dance coexist under one shared roof. Effective soundproofing is the precondition for the shared use of the facility.

  • Even though the main exhibition pavilion in the Giardini was closed, the 2025 Architecture Biennale featured more exhibits than ever before.

    Self-Exploitation in the Celebrity Circus

    At every Architecture Biennale, the curators face the same obstacles: a lack of funding, a great deal of red tape, and an organisation that ignores collective achievements. Why do they put themselves through this? We speak to Albena Yaneva, who spent a year observing the development process of the 2025 Biennale.

  • A vision for the future of Barcelona: Boltshauser Architekten have designed demountable street furniture made from concrete blocks for the Catalan metropolis. The blocks are made from recycled lean-mix concrete layers under roads.

    An End to Downcycling  

    In its current form, concrete recycling does little to help climate protection. The CO₂-intensive cement is lost irretrievably in the process. Boltshauser Architekten are working with a consortium from the Netherlands, Switzerland and Spain on the Respira research project to investigate how this can be avoided.

  • Stress tests have shown that re-use prestressed concrete slabs deflect significantly less than conventional reinforced concrete slabs.

    Slabs Under Tension 

    Concrete floor slabs have the largest carbon footprint of all building elements. In the past, the material was lost irretrievably during demolition. A Swiss consortium is now cutting standard square slabs from buildings due for demolition and using them to manufacture prestressed segmental concrete elements with a higher structural performance than new reinforced concrete.