Research and practice: hybrid timber constructions for high-rise buildings

Multi-storey buildings are still rarely built from timber. Usually building codes and fire protection regulations prohibit greater heights than four to six floors, depending on the country. Nevertheless, the heated debate concerning CO2 emissions as well as the rising prices of steel and concrete predestine timber for use as a building material in large-scale buildings. These advantages provided the incentive for the development of a new timber-based building system for high-rises, named 'LifeCycle Tower'. The first prototype of this system, the eight storey office building, LCT ONE (LifeCycle Tower ONE), was completed in the summer of 2012 in Dornbirn, Austria.

Research and practice: hybrid timber constructions for high-rise buildings
View during construction; in the foreground is the reinforced staircase shaft. © Angela Lamprecht/Hermann Kaufmann ZT GmbH

While most other timber construction projects attempt to maximise the use of timber, the LCT concept focused instead on the most efficient use of resources. LCT ONE is Austria’s first timber building at this height, where the load-bearing timber elements did not need to be enclosed but remained visible and untreated.

The eight storey prototype consists of a circulation core, which stabilises the entire structure, with office spaces attached on one side. Its load-bearing system comprises three main elements, which by nature of their construction are cavity-free: the building core, the floors and the facade supports. The core was originally planned to be constructed from solid timber. Nevertheless, in the case of the LCT ONE pilot project, in-situ concrete had to be used instead. This was primarily due to the Austrian fire protection regulations which do not yet allow for the construction of a structural core made from flammable materials.

The floor slabs are prefabricated units. Each of these 2.1 m units consists of an 8-cm-thick concrete slab supported by four parallel beams made of glued laminated timber (cross section 24 ≈ 28 cm). Each floor element has to be supported on its four corners. At the core, the floor slabs rest on welded steel consoles. Along the facade, supports are formed by the laminated timber columns. The facade columns consist of two glued laminated timber rectangular sections each 24 ≈ 24 cm. Each of the two column halves supports an adjacent floor element. The columns are all hinged columns and are only subject to perpendicular forces.

The facade and floor elements of the upper levels are erected one storey at a time.The end of each construction phase results in one completed storey – with the moisture sensitive wood finishes inside the building protected from inclement weather by the floors and facade elements. Work on the interior finishes can thus begin immediately.

In order to assess the benefits of the composite construction, the client performed a environmental impact assessment according to the criteria defined by the German Sustainable Building Council (DGNB) shortly after the completion of the pilot project. During an assumed life time of 50 years, the LCT ONE emits 27 kg of CO2 per square metre of net floor area per year, of which approximately two thirds result from the building operation and one third from the construction. That is approximately 32 % less CO2 emissions than a conventionally built reinforced concrete building of the same size and with the same use. Over the course of its life cycle, the building thus saves 340 tonnes of CO2 emissions. This is comparable to the amount that a Volkswagen Golf would emit during 60 circumnavigations around the globe.


  • At the last Detail Award in 2025, Esch Sintzel Architekten won one of the three main prizes for their conversion of a wine warehouse in Basel into flats. This year, Detail is introducing a separate category for affordable housing as part of the award.

    Great Architecture on a Small Budget 

    2027 brings a new edition of the Detail Architecture Award - and, for the first time, a prize for affordable housing. Entries close end of October.

  • The new seven-storey building on Hohlstrasse in Zurich will comprise a ground floor with retail space and public service areas, and five upper floors with commercial space.

    Railway Tracks as a Supporting Structure - How Does That Work? 

    Around 180 kilometres of track are replaced every year on the Swiss rail network. Until now, all this scrap metal has been melted down. However, the first building with a steel framework made from recycled rails will soon be constructed in western Zurich.

  • Landscape architect Line Ramstad is the new chief curator of the Oslo Triennale.

    „One Size Does Not Fit All" 

    Facades made from waste wool, recycled steel from decommissioned ships, housing rather than investment property: Line Ramstad, chief curator of the Oslo Triennale, shows what happens when nature takes precedence.

  • Paul Van Ostaijen Culture Campus in Leuven

    Lava architecten transformed an old mission building in Leuven into a place where circus arts, music, theatre, and dance coexist under one shared roof. Effective soundproofing is the precondition for the shared use of the facility.

  • Even though the main exhibition pavilion in the Giardini was closed, the 2025 Architecture Biennale featured more exhibits than ever before.

    Self-Exploitation in the Celebrity Circus

    At every Architecture Biennale, the curators face the same obstacles: a lack of funding, a great deal of red tape, and an organisation that ignores collective achievements. Why do they put themselves through this? We speak to Albena Yaneva, who spent a year observing the development process of the 2025 Biennale.

  • A vision for the future of Barcelona: Boltshauser Architekten have designed demountable street furniture made from concrete blocks for the Catalan metropolis. The blocks are made from recycled lean-mix concrete layers under roads.

    An End to Downcycling  

    In its current form, concrete recycling does little to help climate protection. The CO₂-intensive cement is lost irretrievably in the process. Boltshauser Architekten are working with a consortium from the Netherlands, Switzerland and Spain on the Respira research project to investigate how this can be avoided.