Building type / function
Task
Glass, Render
Load bearing structure
Room type
Interior design
Other building elements
Flooring
Wall surface
Ceiling surface
Reset filters (2)

7,504 results

Skylights provide the more than nine metres tall hall with daylight. Spanning across the space, reinforced concrete beams support the precast concrete ceilings.
Two timber contractors split the production and assembly tasks for the 286 room modules. Prefabrication in the workshop took three months. Installing the entire timber structure was completed in four months.
The office circuits ­offer open spaces that frame the courtyards. Dedicated staircases and meeting rooms in the building corners are part of tenant outfitting.
Heating

Cold supply air, pre-­heated in the facade slot, descends inside the spandrel box (blue), where it is heated by a convector. Inside the box, it draws indoor air upward (yellow) and through the window sill slot (red).

12 results