Building type / function
New construction
Facade material
Load bearing structure
Room type
Interior design
Other building elements
Flooring
Wall surface
Ceiling surface
Reset filters (1)

14,342 results

Luva office, Zirl: vollklimatisierte Arbeitswelt, wirtschaftlich realisiert mit Envola-System.
Skylights provide the more than nine metres tall hall with daylight. Spanning across the space, reinforced concrete beams support the precast concrete ceilings.
The office circuits ­offer open spaces that frame the courtyards. Dedicated staircases and meeting rooms in the building corners are part of tenant outfitting.
Two timber contractors split the production and assembly tasks for the 286 room modules. Prefabrication in the workshop took three months. Installing the entire timber structure was completed in four months.
Heating

Cold supply air, pre-­heated in the facade slot, descends inside the spandrel box (blue), where it is heated by a convector. Inside the box, it draws indoor air upward (yellow) and through the window sill slot (red).

12 results