01.04.2021

Lock Reinforcement in the BIM Process 

At 427 metres long, 55 metres wide and 16.4 metres deep, the Terneuzen Lock in the Nether­lands will be one of the largest in the world when completed in 2023. A not insignificant challenge lies in the fact that the waterway between Paris and Rotterdam needs to remain in operation during the construction work. The joint venture in charge of planning, Sassevaart, uses the digital platform Allplan Bimplus for the 3D ­reinforcement process in order to coordinate all the parallel activities, from design through to implementation between all the planning and project participants as well as for efficient collision control. The software has proven its worth as an integral part of the construction and project management – not least because the ­order, logistics and health and safety requirements can also be better integrated into the planning.

For more information, see:
www.allplan.com

https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/A/l/Allplan-Screen-Sassevaart-TEASER-gross-2021_1.jpg?width=437&height=582&store=de_de&image-type=image https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/A/l/Allplan-TEASER-klein_1.jpg?width=437&height=582&store=de_de&image-type=image
Bitte geben Sie Ihre E-Mail-Adresse ein, um einen Link zum Zurücksetzen Ihres Passworts zu erhalten.
Pflichtfelder
oder
Copyright © 2024 DETAIL. Alle Rechte vorbehalten.