31.05.2003

A New Solid Timber Studio Building in Hellerau

A construction maintenance commission was created in Hellerau after the German Unification in order to control whether new proposed constructions – like this Atelier building - were compatible with the existing built structure. It was attempted to coordinate the advantages of a massive construction system of plywood elements with a simple concept; the Atelier acting as the basis for further examinations and projects. Subsequent to the development of the massive construction techniques; heat treatment, enhancement of impermeability, and textile reinforcement of the timber members is to be considered.
https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/5/1/5166_heftcontent_1.jpg?width=437&height=582&store=de_en&image-type=image
Copyright © 2024 DETAIL. All rights reserved.