28.02.1998

Theatre Extension in Vidy-Lausanne, Switzerland

Additional rehearsal space for this theatre was created in a new structure raised above a parking area. The extension is linked to the existing building by a walkway and by a glazed staircase tower that serves both parts of the complex. Based on the modular steel structural system of the existing building designed by Max Bill in 1964, the extension is raised on four columns that support a twolayer steel girder structure. The north and south faces are fully glazed. The roof is also in a two-layer form of construction, the lighter upper layer of which is cantilevered out on one edge. The extension seems to hover above the ground and establish a reciprocal relationship between indoor and outdoor space.
Please enter your email address below to receive a password reset link.
Mandatory fields
or
Copyright © 2024 DETAIL. All rights reserved.