01.12.2018

Urban BIM Model by Autodesk

Photo: Paul Sindram

In May of this year, the city selected four finalist teams from a total of 42 entries, who will now continue to work on their competition proposals until spring 2019. To create the master model, Autodesk used Infra­Works for the floor surfaces and 3ds Max for the modelling of buildings and structures. The final visualizations will be created in 3ds Max. A simplified Infra-Works model into which the building data from 3ds Max has also been transferred is available to the competition participants for developing their designs.

www.autodesk.de
https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/1/2/1286748000_836_800_533.jpg?width=437&height=582&store=de_en&image-type=image https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/A/u/Autodesk_3dsMax-T735.jpg?width=437&height=582&store=de_en&image-type=image https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/A/u/Autodesk_3dsMaxT1500.jpg?width=437&height=582&store=de_en&image-type=image
Copyright © 2024 DETAIL. All rights reserved.