06.09.2020

Mixed Construction

The new climbing and bouldering hall in Villingen-Schwenningen consists of a hall complex and a social wing. The first hall ­section is 25 m wide, 35 m long and 10 m high. If necessary, a second level can be added later on. The second part of the hall contains a 16-m-high climbing tower with a base area of 12 × 8.5 m. Brüninghoff erected the climbing area as a skeleton structure, and the social wing as a solid structure.

The facade of the skeleton structure ­consists of an insulated sandwich panel, which ­is lined with rigid polyurethane foam. The roof trusses and glue-laminated beams were ­dimensioned larger than usual due to the ­expected snow pressure. They also bridge spans of up to 25 m in the climbing hall. Elements made of silver fir were used for the solid construction.

www.brueninghoff.de

https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/B/r/Brueninghoff-9-20-Teaser-gr-.jpg?width=437&height=582&store=de_de&image-type=image https://detail-cdn.s3.eu-central-1.amazonaws.com/media/catalog/product/B/r/Brueninghoff-9-20-Teaser.jpg?width=437&height=582&store=de_de&image-type=image
Bitte geben Sie Ihre E-Mail-Adresse ein, um einen Link zum Zurücksetzen Ihres Passworts zu erhalten.
Pflichtfelder
oder
Copyright © 2024 DETAIL. Alle Rechte vorbehalten.